Dec 28, 2012 No universal formula links these variables to how much power the belt consumes. … the conveyor belt must move 330 tons each hour: 330 x 0.907 = 300 tonnes per hour
Nov 07, 2012 The required design production is 800 tons per hour over 14 hours per day. … range of possible values is given in Table 6-9 pg. 95 More detailed calculation formula to find capacity of moving conveyor belt in
Get Price
ton per hour formula Askives Answers to your questions. What is the formula for determining the tons per hour on a conveyor belt by ... how to calculate the aggregate conveyor capacity in tons per hour
Get Price
=tons per hour conveyed, tph, short tons of 2,000 lbs S i =troughing idler spacing, ft T ac =total of the tensions from conveyor accessories, lbs: T am =tension resulting from the force to accelerate the material continuously as it is fed onto the belts, lbs T b =tension resulting from the force needed to lift or lower the belt, lbs (see page
Get Price
Consult the CEMA Belt conveyor manual or Orthman Engineering Department. STEP 3: Determine Operating Speed . Using Table 2 (below), determine the conveyor operating speed in feet per minute (FPM) TABLE 2 . Capacity, Tons per Hour (TPH) Belt Speed, Feet per minute (FPM) Material . Density . PCF BELT WIDTH, INCHES 100 : 150 200 : 250 300 : 350
Get Price
Jul 23, 2019 Calculating-tons-per-hour-of-limestone-on-running-Over-Land-Belt-Conveyor. The main objective is to reckon or calculate the area covered by limestone on running OLBC (Over Land Belt Conveyor) and subsequently, converting it into volume to thereby estimate tons per hour
Get Price
A screw conveyor is required to transport 10 tons per hour of unslaked lime with a bulk density of 60 lbs/ft 3. The unslaked lime also needs to be mixed in transit using cut and folded flights. The conveying distance is 15-feet, so short (2/3) pitch screws will be used to ensure proper mixing
Get Price
Example: If a belt-conveyor scale system has a maximum rated capacity of 200 tons per hour (tph), and the normal use flow rate is 150 tph (75 % of the maximum
Get Price
28'9 Tons per hour: 800 tph: Machine dimensions; Belt size: 80' 48 Working size: 76'9 12'8 28'9 Transport size: 51'7 8'5 8'9 ... meaning you can load material with a maximum of roughly 40 in to the hopper. However, normal use for most conveyors is with a processed material no larger than 10 . Materials used on this conveyor can range
Get Price
(l) Two (2) conveyors, capacity: 300 tons of sand and gravel per hour each. (m) Nine (9) conveyors, capacity: 200 tons of sand and gravel per hour each. (n) Two (2) conveyors, capacity: 75 tons of sand and gravel per hour each. A.3 SSOA Applicability [326 IAC 2-9-1]
Get Price
Standard widths range from 30-84 inches, and they can transport about 15,000 tons of material per hour at a maximum. Transfer Conveyors Versatility is the name of the game with transfer conveyors , which work in conveyor systems to solve tricky changes in elevation, turns in the system’s path, or transitions between other conveyor types
Get Price
A stacker conveyor is essential for stockpiling aggregates of any kind. More efficient than wheel loaders or screw conveyors, with less dust and reduced product damage, a stacker conveyor moves up to 1,200 tons per hour of material into a stockpile. A stacker conveyor consists of a conveyor
Get Price
1212 FBL Overhead Drag Conveyors120 ton per hour capacity (based on 60 lb. per cu. ft. material)1214 FBL Overhead Drag Conveyors. Standard Features: Head Section. 3/16” #304 stainless steel shell construction. Bolt on #304 top cover. Heavy duty stainless steel reversable motor mount, bolt-on design for access to drive sprocket
Get Price
Tough 16″ or 24″ PVC belt travels smoothly over 2″ carrier idlers and will deliver up to 240 tons* per hour. Carrier idlers are on 2′ centers, return idlers on 10′ centers. 8″ drive pulley is welded steel with rubber lagging. All bearings are self-aligning, anti-friction
Get Price
95% Loaded Conveyors. Conveyor loadings may sometime exceed the recom mended % of Loading, listed in the materials table. Considerations as to the material characteristics may justify up to 95% loading of tubular or shrouded con veyors. The following table lists maximum speeds limited with regard to the percentage of loading nor mally
Get Price
A conveyor is required to transport 10 tons per hour of a material weighing 62 pounds per cubic foot and having a maximum particle size of 100 mesh. To further complicate the problem, we will require that the material be mixed in transit using cut and folded flights
Get Price
Capacity: 325 tons per hour Material: Limestone Density: 65 lbs per cubic foot Lump size: 3/8 inch to 0 with a high percentage of fines. 5.0 DESIGN AND MANUFACTURE 5.1 GENERAL 5.1.1 The Belt Conveyors shall be designed and manufactured for heavy-duty, minimum maintenance, outdoor, 24-hour per day paper mill boiler service
Get Price
Determine the density of the material in pounds per cubic foot (lb/ft3). 3. Choose the idler shape. 4. Select a suitable conveyor belt speed. 5. Convert the desired tonnage per hour (tph) to be conveyed to the equivalent in cubic feet per hour (ft3/hr). (ex. 1000 tph x 2000 / 60 = 33333 ft3/hr) 6. Convert the desired capacity in cubic feet per
Get Price
Built for rugged use, handling up to 90 tons of material per hour on the 24 in. wide belt, and 120 tons of material per hour on the 30 in. wide belt. Equipped with a wheeled undercarriage, located at the conveyor’s balance point for convenient one-person positioning. Hawley, MN •
Get Price
=tons per hour conveyed, tph, short tons of 2,000 lbs S i =troughing idler spacing, ft T ac =total of the tensions from conveyor accessories, lbs: T am =tension resulting from the force to accelerate the material continuously as it is fed onto the belts, lbs T b =tension resulting from the force needed to lift or lower the belt, lbs (see page
Get Price
Dec 31, 2012 What is the formula for determining the tons per hour on a … What is the formula for determining the tons per hour on a conveyor belt by taking a 1 foot belt cut? In: … 10.5lbs * 350 fpm * 60 / 2000 = 110.25 TPH
Get Price
Jun 24, 2010 The speed of the belt needs to be known (Feet Per Minute). You would take the weight of your sample in pounds * FPM of the Belt * 60min / 2000lbs = TPH. For example if your belt is moving 350 fpm and your belt cut weighed 10.5 lbs; 10.5lbs * 350 fpm * 60 / 2000 = 110.25 TPH
Get Price
Sep 18, 2008 Tons per hour is a time based rate. kWh is energy, and not a rate. kW is a rate. Your method looked fine until you got to the 4th paragraph. You have a kWh value for moving 800tons (with no time divisor). Divide by 800 to get kWh per ton, the value management asked for
Get Price